18519 train VSKP LTT EXPRES

18519 starts from VSKP (Visakhapatnam) at 23:20 and reaches LTT (Lokmanyatilak) at 04:30 covering a distance of 1502 kms and 24 stations. 18519 is scheduled to run on Sun, Mon, Tue, Wed, Thu, Fri, Sat at 23:20 from VSKP Visakhapatnam station to reach LTT Lokmanyatilak at 04:30.

Train 18519 VSKP LTT EXPRES

18519 chart preparation time

18519 chart preparation time today is 13:16 (01:16 PM) for the train starting from Visakhapatnam at 23:20.

Based on Indian Railways regulations, the First Reservation Chart for morning trains is typically prepared by 08:00 PM the previous evening. For all other departures, the first chart is finalized at least 8-10 hours before the scheduled start time.

The Second and Final Reservation Chart is prepared 30 minutes before the train departs from the charting station. Any last-minute changes or current bookings are reflected only in this final chart.

Train 18519 coach position seat map live

18519 train coach position today is:

  1. ENG
  2. SLRD
  3. GEN
  4. S1
  5. S2
  6. S3
  7. S4
  8. S5
  9. S6
  10. B1
  11. B2
  12. B3
  13. B4
  14. B5
  15. A1
  16. A2
  17. H1
  18. LPR

Train VSKP LTT EXPRES 18519 coach position from engine to rear:

PosCoachClass
1ENG Engine
2SLRD Luggage & Divyang
3GEN General
4GEN General
5S1SL Sleeper Class
6S2SL Sleeper Class
7S3SL Sleeper Class
8S4SL Sleeper Class
9S5SL Sleeper Class
10S6SL Sleeper Class
11B13A Third AC
12B23A Third AC
13B33A Third AC
14B43A Third AC
15B53A Third AC
16A12A Second AC
17A22A Second AC
18H11A First AC
19GEN General
20GEN General
21LPR Luggage & Parcel

18519 coach composition and seat mapping is of 6 SL, 5 3A, 2 2A, 1 1A class coaches/bogies/rakes. See live coach position of yesterday, today, and tomorrow here at coach position page.

18519 seat map images:

h1 he1 coach (1A in train) (first class 1 tier ac) ha1 hae1 coach (1A 2A in train) (first second class ac composite) hb1 coach (1A 3A in train) (first third class ac composite)a1 ae1 av1 coach (2A in train) (second class 2 tier ac) ab1 coach (2A 3A in train) (second third class ac composite)b1 bv1 be1 coach (3A in train) (third class 3 tier AC) g1 coach (3A in train) (third class ac garib rath)s1 se1 coach (SL in train) (sleeper class)

18519 coach position at station: Coach position changes at BZA

StationCoach Position
VSKP (Visakhapatnam)ENG SLRD GEN GEN S1 S2 S3 S4 S5 S6 B1 B2 B3 B4 B5 A1 A2 H1 GEN GEN LPR
DVD (Duvvada)ENG SLRD GEN GEN S1 S2 S3 S4 S5 S6 B1 B2 B3 B4 B5 A1 A2 H1 GEN GEN LPR
PAP (Pithapuram)ENG SLRD GEN GEN S1 S2 S3 S4 S5 S6 B1 B2 B3 B4 B5 A1 A2 H1 GEN GEN LPR
SLO (Samalkot JN)ENG SLRD GEN GEN S1 S2 S3 S4 S5 S6 B1 B2 B3 B4 B5 A1 A2 H1 GEN GEN LPR
RJY (Rajamundry)ENG SLRD GEN GEN S1 S2 S3 S4 S5 S6 B1 B2 B3 B4 B5 A1 A2 H1 GEN GEN LPR
TNKU (Tanuku)ENG SLRD GEN GEN S1 S2 S3 S4 S5 S6 B1 B2 B3 B4 B5 A1 A2 H1 GEN GEN LPR
BVRT (Bhimavaram Town)ENG SLRD GEN GEN S1 S2 S3 S4 S5 S6 B1 B2 B3 B4 B5 A1 A2 H1 GEN GEN LPR
AKVD (Akividu)ENG SLRD GEN GEN S1 S2 S3 S4 S5 S6 B1 B2 B3 B4 B5 A1 A2 H1 GEN GEN LPR
KKLR (Kaikolur)ENG SLRD GEN GEN S1 S2 S3 S4 S5 S6 B1 B2 B3 B4 B5 A1 A2 H1 GEN GEN LPR
GDV (Gudivada JN)ENG SLRD GEN GEN S1 S2 S3 S4 S5 S6 B1 B2 B3 B4 B5 A1 A2 H1 GEN GEN LPR
BZA (Vijayawada JN)ENG LPR GEN GEN H1 A2 A1 B5 B4 B3 B2 B1 S6 S5 S4 S3 S2 S1 GEN GEN SLRD
KZJ (Kazipet JN)ENG LPR GEN GEN H1 A2 A1 B5 B4 B3 B2 B1 S6 S5 S4 S3 S2 S1 GEN GEN SLRD
CHZ (Charlapalli)ENG LPR GEN GEN H1 A2 A1 B5 B4 B3 B2 B1 S6 S5 S4 S3 S2 S1 GEN GEN SLRD
SC (Secunderabad JN)ENG LPR GEN GEN H1 A2 A1 B5 B4 B3 B2 B1 S6 S5 S4 S3 S2 S1 GEN GEN SLRD
LPI (Lingampalli)ENG LPR GEN GEN H1 A2 A1 B5 B4 B3 B2 B1 S6 S5 S4 S3 S2 S1 GEN GEN SLRD
VKB (Vikarabad JN)ENG LPR GEN GEN H1 A2 A1 B5 B4 B3 B2 B1 S6 S5 S4 S3 S2 S1 GEN GEN SLRD
TDU (Tandur)ENG LPR GEN GEN H1 A2 A1 B5 B4 B3 B2 B1 S6 S5 S4 S3 S2 S1 GEN GEN SLRD
WADI (Wadi JN)ENG LPR GEN GEN H1 A2 A1 B5 B4 B3 B2 B1 S6 S5 S4 S3 S2 S1 GEN GEN SLRD
KLBG (Kalaburagi)ENG LPR GEN GEN H1 A2 A1 B5 B4 B3 B2 B1 S6 S5 S4 S3 S2 S1 GEN GEN SLRD
SUR (Solapur JN)ENG LPR GEN GEN H1 A2 A1 B5 B4 B3 B2 B1 S6 S5 S4 S3 S2 S1 GEN GEN SLRD
PUNE (Pune JN)ENG LPR GEN GEN H1 A2 A1 B5 B4 B3 B2 B1 S6 S5 S4 S3 S2 S1 GEN GEN SLRD
LNL (Lonavala)ENG LPR GEN GEN H1 A2 A1 B5 B4 B3 B2 B1 S6 S5 S4 S3 S2 S1 GEN GEN SLRD
KYN (Kalyan JN)ENG LPR GEN GEN H1 A2 A1 B5 B4 B3 B2 B1 S6 S5 S4 S3 S2 S1 GEN GEN SLRD
LTT (Lokmanyatilak)ENG LPR GEN GEN H1 A2 A1 B5 B4 B3 B2 B1 S6 S5 S4 S3 S2 S1 GEN GEN SLRD

vskp ltt expres 18519 train live route map

train 18519 map

18519 train route, schedule and stations time table

CodeDayArrivalDepartsHaltKMsPFStation
VSKP123:2023:20008Visakhapatnam
DVD123:5023:522181Duvvada
PAP201:0901:1011382Pithapuram
SLO201:1801:2021513Samalkot JN
RJY202:0802:1022011Rajamundry
TNKU203:0803:1022401Tanuku
BVRT203:4403:451270Bhimavaram Town
AKVD204:0404:0512871Akividu
KKLR204:2404:2513042Kaikolur
GDV204:5805:0023333Gudivada JN
BZA206:3006:45153787Vijayawada JN
KZJ210:3810:4025992Kazipet JN
CHZ212:3512:4057185Charlapalli
SC212:5513:00573010Secunderabad JN
LPI213:2413:2517532Lingampalli
VKB214:0414:0518021Vikarabad JN
TDU214:3414:3518452Tandur
WADI216:3516:3729153Wadi JN
KLBG217:1717:2039521Kalaburagi
SUR219:4519:50510654Solapur JN
PUNE300:3500:40513271Pune JN
LNL301:5401:56213912Lonavala
KYN303:1003:12214666Kalyan JN
LTT304:3004:30015023Lokmanyatilak

vskp ltt expres 18519 train running status

CodePFArrivalDepartureHalt
VSKP823:2023:200
DVD123:5023:522
PAP201:0901:101
SLO301:1801:202
RJY102:0802:102
TNKU103:0803:102
BVRT03:4403:451
AKVD104:0404:051
KKLR204:2404:251
GDV304:5805:002
BZA706:3006:4515
KZJ210:3810:402
CHZ512:3512:405
SC1012:5513:005
LPI213:2413:251
VKB114:0414:051
TDU214:3414:351
WADI316:3516:372
KLBG117:1717:203
SUR419:4519:505
PUNE100:3500:405
LNL201:5401:562
KYN603:1003:122
LTT304:3004:300