12819 train SAMPARK KR SF
12819 starts from BBS (Bhubaneswar) at 16:15 and reaches ANVT (Anand Vihar Terminal) at 19:35 covering a distance of 1777 kms and 13 stations. 12819 is scheduled to run on Sun, Wed at 16:15 from BBS Bhubaneswar station to reach ANVT Anand Vihar Terminal at 19:35.
Train 12819 SAMPARK KR SF
- Train Number: 12819 Name: SAMPARK KR SF (ब्ब्स्-अनन्न्द्विहर् तेर्मिनुस् सम्पर्क् क्रन्ति इएक्सप्रेस्स्)
- Chart preparation time: prev day at 21:15
- Type: SUF (SUPERFAST) covering 1777 kms in 27 hours 20 mins
- Frequency: Runs 2 days Sun Wed
- Route: Bhubaneswar (BBS) to Anand Vihar Terminal (ANVT).
- Major Stops: CTC (Cuttack), BLS (Balasore), HIJ (Hijli), TATA (Tatanagar JN), GMO (NSC Bose J Gomo), DDU (Ptdeen Dayal Upadhyaya JN), CNB (Kanpur Central)
- Coaches: 5 Third AC, 2 Second AC, 1 First AC, 6 Sleeper Class
12819 chart preparation time
12819 chart preparation time was 21:15 (09:15 PM) last night, as it is prepared a day before for the train starting today from Bhubaneswar at 16:15.
Based on Indian Railways regulations, the First Reservation Chart for morning trains is typically prepared by 08:00 PM the previous evening. For all other departures, the first chart is finalized at least 8-10 hours before the scheduled start time.
The Second and Final Reservation Chart is prepared 30 minutes before the train departs from the charting station. Any last-minute changes or current bookings are reflected only in this final chart.
Train 12819 coach position seat map live
12819 train coach position today is:
- ENG
- SLRD
- GEN
- B1
- B2
- B3
- B4
- B5
- A1
- A2
- H1
- PC
- S1
- S2
- S3
- S4
- S5
- S6
- LPR
- VP
Train SAMPARK KR SF 12819 coach position from engine to rear:
| Pos | Coach | Class |
|---|---|---|
| 1 | ENG | Engine |
| 2 | SLRD | Luggage & Divyang |
| 3 | GEN | General |
| 4 | GEN | General |
| 5 | B1 | 3A Third AC |
| 6 | B2 | 3A Third AC |
| 7 | B3 | 3A Third AC |
| 8 | B4 | 3A Third AC |
| 9 | B5 | 3A Third AC |
| 10 | A1 | 2A Second AC |
| 11 | A2 | 2A Second AC |
| 12 | H1 | 1A First AC |
| 13 | PC | Pantry Car |
| 14 | S1 | SL Sleeper Class |
| 15 | S2 | SL Sleeper Class |
| 16 | S3 | SL Sleeper Class |
| 17 | S4 | SL Sleeper Class |
| 18 | S5 | SL Sleeper Class |
| 19 | S6 | SL Sleeper Class |
| 20 | GEN | General |
| 21 | GEN | General |
| 22 | LPR | Luggage & Parcel |
| 23 | VP | Parcel Van |
12819 coach composition and seat mapping is of 5 3A, 2 2A, 1 1A, 6 SL class coaches/bogies/rakes. See live coach position of yesterday, today, and tomorrow here at coach position page.
12819 seat map images:




12819 coach position at station: coach position stays same across station as there are no engine direction reversal stations
| Station | Coach Position |
|---|---|
| BBS (Bhubaneswar) | ENG SLRD GEN GEN B1 B2 B3 B4 B5 A1 A2 H1 PC S1 S2 S3 S4 S5 S6 GEN GEN LPR VP |
| CTC (Cuttack) | ENG SLRD GEN GEN B1 B2 B3 B4 B5 A1 A2 H1 PC S1 S2 S3 S4 S5 S6 GEN GEN LPR VP |
| JJKR (Jajpur K Road) | ENG SLRD GEN GEN B1 B2 B3 B4 B5 A1 A2 H1 PC S1 S2 S3 S4 S5 S6 GEN GEN LPR VP |
| BHC (Bhadrakh) | ENG SLRD GEN GEN B1 B2 B3 B4 B5 A1 A2 H1 PC S1 S2 S3 S4 S5 S6 GEN GEN LPR VP |
| SORO (Soro) | ENG SLRD GEN GEN B1 B2 B3 B4 B5 A1 A2 H1 PC S1 S2 S3 S4 S5 S6 GEN GEN LPR VP |
| BLS (Balasore) | ENG SLRD GEN GEN B1 B2 B3 B4 B5 A1 A2 H1 PC S1 S2 S3 S4 S5 S6 GEN GEN LPR VP |
| JER (Jaleswar) | ENG SLRD GEN GEN B1 B2 B3 B4 B5 A1 A2 H1 PC S1 S2 S3 S4 S5 S6 GEN GEN LPR VP |
| HIJ (Hijli) | ENG SLRD GEN GEN B1 B2 B3 B4 B5 A1 A2 H1 PC S1 S2 S3 S4 S5 S6 GEN GEN LPR VP |
| TATA (Tatanagar JN) | ENG SLRD GEN GEN B1 B2 B3 B4 B5 A1 A2 H1 PC S1 S2 S3 S4 S5 S6 GEN GEN LPR VP |
| GMO (NSC Bose J Gomo) | ENG SLRD GEN GEN B1 B2 B3 B4 B5 A1 A2 H1 PC S1 S2 S3 S4 S5 S6 GEN GEN LPR VP |
| DDU (Ptdeen Dayal Upadhyaya JN) | ENG SLRD GEN GEN B1 B2 B3 B4 B5 A1 A2 H1 PC S1 S2 S3 S4 S5 S6 GEN GEN LPR VP |
| CNB (Kanpur Central) | ENG SLRD GEN GEN B1 B2 B3 B4 B5 A1 A2 H1 PC S1 S2 S3 S4 S5 S6 GEN GEN LPR VP |
| ANVT (Anand Vihar Terminal) | ENG SLRD GEN GEN B1 B2 B3 B4 B5 A1 A2 H1 PC S1 S2 S3 S4 S5 S6 GEN GEN LPR VP |
sampark kr sf 12819 train live route map

12819 train route, schedule and stations time table
| Code | Day | Arrival | Departs | Halt | KMs | PF | Station |
|---|---|---|---|---|---|---|---|
| BBS | 1 | 16:15 | 16:15 | 0 | 0 | 2 | Bhubaneswar |
| CTC | 1 | 16:50 | 16:55 | 5 | 27 | 2 | Cuttack |
| JJKR | 1 | 17:43 | 17:45 | 2 | 99 | 2 | Jajpur K Road |
| BHC | 1 | 18:45 | 18:47 | 2 | 143 | 3 | Bhadrakh |
| SORO | 1 | 19:05 | 19:07 | 2 | 168 | 2 | Soro |
| BLS | 1 | 19:32 | 19:37 | 5 | 202 | 3 | Balasore |
| JER | 1 | 20:18 | 20:20 | 2 | 249 | 2 | Jaleswar |
| HIJ | 1 | 21:13 | 21:23 | 10 | 314 | 1 | Hijli |
| TATA | 1 | 23:22 | 23:27 | 5 | 447 | 3 | Tatanagar JN |
| GMO | 2 | 03:25 | 03:30 | 5 | 629 | 4 | NSC Bose J Gomo |
| DDU | 2 | 08:30 | 08:40 | 10 | 1002 | 6 | Ptdeen Dayal Upadhyaya JN |
| CNB | 2 | 13:20 | 13:25 | 5 | 1349 | 3 | Kanpur Central |
| ANVT | 2 | 19:35 | 19:35 | 0 | 1777 | 4 | Anand Vihar Terminal |
sampark kr sf 12819 train running status
| Code | PF | Arrival | Departure | Halt |
|---|---|---|---|---|
| BBS | 2 | 16:15 | 16:15 | 0 |
| CTC | 2 | 16:50 | 16:55 | 5 |
| JJKR | 2 | 17:43 | 17:45 | 2 |
| BHC | 3 | 18:45 | 18:47 | 2 |
| SORO | 2 | 19:05 | 19:07 | 2 |
| BLS | 3 | 19:32 | 19:37 | 5 |
| JER | 2 | 20:18 | 20:20 | 2 |
| HIJ | 1 | 21:13 | 21:23 | 10 |
| TATA | 3 | 23:22 | 23:27 | 5 |
| GMO | 4 | 03:25 | 03:30 | 5 |
| DDU | 6 | 08:30 | 08:40 | 10 |
| CNB | 3 | 13:20 | 13:25 | 5 |
| ANVT | 4 | 19:35 | 19:35 | 0 |