12260 train SDAH DURONTO
12260 starts from BKN (Bikaner JN) at 12:10 and reaches SDAH (Sealdah) at 13:25 covering a distance of 1922 kms and 12 stations. 12260 is scheduled to run on Mon, Tue, Thu, Fri at 12:10 from BKN Bikaner JN station to reach SDAH Sealdah at 13:25.
Train 12260 SDAH DURONTO
- Train Number: 12260 Name: SDAH DURONTO (बिकानीर सियालदा दुरन्त इक्सप्रेस)
- Chart preparation time: prev day at 22:52
- Type: DRNT (DURONTO EXPRESS) covering 1922 kms in 25 hours 15 mins
- Frequency: Runs 4 days Mon Tue Thu Fri
- Route: Bikaner JN (BKN) to Sealdah (SDAH).
- Major Stops: CUR (Churu), NDLS (NEW Delhi), CNB (Kanpur Central), DDU (Ptdeen Dayal Upadhyaya JN), DHN (Dhanbad JN)
- Coaches: 2 Luggage & Parcel, 4 Second AC, 1 First AC, 12 Third AC
12260 chart preparation time
12260 chart preparation time was 22:52 (10:52 PM) last night, as it is prepared a day before for the train starting today from Bikaner JN at 12:10.
Based on Indian Railways regulations, the First Reservation Chart for morning trains is typically prepared by 08:00 PM the previous evening. For all other departures, the first chart is finalized at least 8-10 hours before the scheduled start time.
The Second and Final Reservation Chart is prepared 30 minutes before the train departs from the charting station. Any last-minute changes or current bookings are reflected only in this final chart.
Train 12260 coach position seat map live
12260 train coach position today is:
- ENG
- PWR
- A4
- A3
- A2
- A1
- H1
- PC
- B12
- B11
- B10
- B9
- B8
- B7
- B6
- B5
- B4
- B3
- B2
- B1
Train SDAH DURONTO 12260 coach position from engine to rear:
| Pos | Coach | Class |
|---|---|---|
| 1 | ENG | Engine |
| 2 | PWR | LPR Luggage & Parcel |
| 3 | A4 | 2A Second AC |
| 4 | A3 | 2A Second AC |
| 5 | A2 | 2A Second AC |
| 6 | A1 | 2A Second AC |
| 7 | H1 | 1A First AC |
| 8 | PC | Pantry Car |
| 9 | B12 | 3A Third AC |
| 10 | B11 | 3A Third AC |
| 11 | B10 | 3A Third AC |
| 12 | B9 | 3A Third AC |
| 13 | B8 | 3A Third AC |
| 14 | B7 | 3A Third AC |
| 15 | B6 | 3A Third AC |
| 16 | B5 | 3A Third AC |
| 17 | B4 | 3A Third AC |
| 18 | B3 | 3A Third AC |
| 19 | B2 | 3A Third AC |
| 20 | B1 | 3A Third AC |
| 21 | PWR | LPR Luggage & Parcel |
12260 coach composition and seat mapping is of 2 LPR, 4 2A, 1 1A, 12 3A class coaches/bogies/rakes. See live coach position of yesterday, today, and tomorrow here at coach position page.
12260 seat map images:



12260 coach position at station: coach position stays same across station as there are no engine direction reversal stations
| Station | Coach Position |
|---|---|
| BKN (Bikaner JN) | ENG PWR A4 A3 A2 A1 H1 PC B12 B11 B10 B9 B8 B7 B6 B5 B4 B3 B2 B1 PWR |
| SDGH (SRI Dungargarh) | ENG PWR A4 A3 A2 A1 H1 PC B12 B11 B10 B9 B8 B7 B6 B5 B4 B3 B2 B1 PWR |
| RTGH (Ratangarh JN) | ENG PWR A4 A3 A2 A1 H1 PC B12 B11 B10 B9 B8 B7 B6 B5 B4 B3 B2 B1 PWR |
| CUR (Churu) | ENG PWR A4 A3 A2 A1 H1 PC B12 B11 B10 B9 B8 B7 B6 B5 B4 B3 B2 B1 PWR |
| SDLP (Sadulpur JN) | ENG PWR A4 A3 A2 A1 H1 PC B12 B11 B10 B9 B8 B7 B6 B5 B4 B3 B2 B1 PWR |
| LHU (Loharu) | ENG PWR A4 A3 A2 A1 H1 PC B12 B11 B10 B9 B8 B7 B6 B5 B4 B3 B2 B1 PWR |
| NDLS (NEW Delhi) | ENG PWR A4 A3 A2 A1 H1 PC B12 B11 B10 B9 B8 B7 B6 B5 B4 B3 B2 B1 PWR |
| CNB (Kanpur Central) | ENG PWR A4 A3 A2 A1 H1 PC B12 B11 B10 B9 B8 B7 B6 B5 B4 B3 B2 B1 PWR |
| DDU (Ptdeen Dayal Upadhyaya JN) | ENG PWR A4 A3 A2 A1 H1 PC B12 B11 B10 B9 B8 B7 B6 B5 B4 B3 B2 B1 PWR |
| KQR (Koderma) | ENG PWR A4 A3 A2 A1 H1 PC B12 B11 B10 B9 B8 B7 B6 B5 B4 B3 B2 B1 PWR |
| DHN (Dhanbad JN) | ENG PWR A4 A3 A2 A1 H1 PC B12 B11 B10 B9 B8 B7 B6 B5 B4 B3 B2 B1 PWR |
| SDAH (Sealdah) | ENG PWR A4 A3 A2 A1 H1 PC B12 B11 B10 B9 B8 B7 B6 B5 B4 B3 B2 B1 PWR |
sdah duronto 12260 train live route map

12260 train route, schedule and stations time table
| Code | Day | Arrival | Departs | Halt | KMs | PF | Station |
|---|---|---|---|---|---|---|---|
| BKN | 1 | 12:10 | 12:10 | 0 | 0 | 4 | Bikaner JN |
| SDGH | 1 | 13:00 | 13:02 | 2 | 73 | 1 | SRI Dungargarh |
| RTGH | 1 | 13:50 | 13:53 | 3 | 137 | 1 | Ratangarh JN |
| CUR | 1 | 14:30 | 14:35 | 5 | 180 | 1 | Churu |
| SDLP | 1 | 15:15 | 15:18 | 3 | 238 | 3 | Sadulpur JN |
| LHU | 1 | 15:55 | 15:58 | 3 | 287 | 1 | Loharu |
| NDLS | 1 | 19:30 | 19:45 | 15 | 462 | 13 | NEW Delhi |
| CNB | 2 | 00:35 | 00:40 | 5 | 903 | 5 | Kanpur Central |
| DDU | 2 | 04:35 | 04:45 | 10 | 1250 | 1 | Ptdeen Dayal Upadhyaya JN |
| KQR | 2 | 07:55 | 07:57 | 2 | 1530 | 3 | Koderma |
| DHN | 2 | 09:12 | 09:17 | 5 | 1653 | 1 | Dhanbad JN |
| SDAH | 2 | 13:25 | 13:25 | 0 | 1923 | 14 | Sealdah |
sdah duronto 12260 train running status
| Code | PF | Arrival | Departure | Halt |
|---|---|---|---|---|
| BKN | 4 | 12:10 | 12:10 | 0 |
| SDGH | 1 | 13:00 | 13:02 | 2 |
| RTGH | 1 | 13:50 | 13:53 | 3 |
| CUR | 1 | 14:30 | 14:35 | 5 |
| SDLP | 3 | 15:15 | 15:18 | 3 |
| LHU | 1 | 15:55 | 15:58 | 3 |
| NDLS | 13 | 19:30 | 19:45 | 15 |
| CNB | 5 | 00:35 | 00:40 | 5 |
| DDU | 1 | 04:35 | 04:45 | 10 |
| KQR | 3 | 07:55 | 07:57 | 2 |
| DHN | 1 | 09:12 | 09:17 | 5 |
| SDAH | 14 | 13:25 | 13:25 | 0 |