12019 train SHATABDI EXP

12019 starts from HWH (Howrah JN) at 06:05 and reaches RNC (Ranchi) at 13:15 covering a distance of 421 kms and 9 stations. 12019 is scheduled to run on Mon, Tue, Wed, Thu, Fri, Sat at 06:05 from HWH Howrah JN station to reach RNC Ranchi at 13:15.

Train 12019 SHATABDI EXP

12019 chart preparation time

12019 chart preparation time was 19:45 (07:45 PM) last night, as it is prepared a day before for the train starting today from Howrah JN at 06:05.

Based on Indian Railways regulations, the First Reservation Chart for morning trains is typically prepared by 08:00 PM the previous evening. For all other departures, the first chart is finalized at least 8-10 hours before the scheduled start time.

The Second and Final Reservation Chart is prepared 30 minutes before the train departs from the charting station. Any last-minute changes or current bookings are reflected only in this final chart.

Train 12019 coach position seat map live

12019 train coach position today is:

  1. ENG
  2. LPR
  3. C1
  4. C2
  5. C3
  6. C4
  7. C5
  8. E2
  9. E1

Train SHATABDI EXP 12019 coach position from engine to rear:

PosCoachClass
1ENG Engine
2LPR Luggage & Parcel
3C1CC AC Chair Car
4C2CC AC Chair Car
5C3CC AC Chair Car
6C4CC AC Chair Car
7C5CC AC Chair Car
8E2EC Executive Chair Car
9E1EC Executive Chair Car
10LPR Luggage & Parcel

12019 coach composition and seat mapping is of 5 CC, 2 EC class coaches/bogies/rakes. See live coach position of yesterday, today, and tomorrow here at coach position page.

12019 seat map images:

e1 ex1 coach (EC EA in train) (executive chair car anubhuti)c1 j1 coach (CC in train) (chair car AC garib rath)

12019 coach position at station: coach position stays same across station as there are no engine direction reversal stations

StationCoach Position
HWH (Howrah JN)ENG LPR C1 C2 C3 C4 C5 E2 E1 LPR
DGR (Durgapur)ENG LPR C1 C2 C3 C4 C5 E2 E1 LPR
RNG (Raniganj)ENG LPR C1 C2 C3 C4 C5 E2 E1 LPR
ASN (Asansol JN)ENG LPR C1 C2 C3 C4 C5 E2 E1 LPR
DHN (Dhanbad JN)ENG LPR C1 C2 C3 C4 C5 E2 E1 LPR
CRP (Chandrapura)ENG LPR C1 C2 C3 C4 C5 E2 E1 LPR
BKSC (Bokaro Steel City)ENG LPR C1 C2 C3 C4 C5 E2 E1 LPR
MURI (Muri JN)ENG LPR C1 C2 C3 C4 C5 E2 E1 LPR
RNC (Ranchi)ENG LPR C1 C2 C3 C4 C5 E2 E1 LPR

shatabdi exp 12019 train live route map

train 12019 map

12019 train route, schedule and stations time table

CodeDayArrivalDepartsHaltKMsPFStation
HWH106:0506:050010Howrah JN
DGR107:3807:4021573Durgapur
RNG107:5607:5821811Raniganj
ASN108:1208:1421994Asansol JN
DHN109:2309:2852575Dhanbad JN
CRP110:2410:2622911Chandrapura
BKSC110:5511:0053062Bokaro Steel City
MURI111:4511:4723592Muri JN
RNC113:1513:1504223Ranchi

shatabdi exp 12019 train running status

CodePFArrivalDepartureHalt
HWH1006:0506:050
DGR307:3807:402
RNG107:5607:582
ASN408:1208:142
DHN509:2309:285
CRP110:2410:262
BKSC210:5511:005
MURI211:4511:472
RNC313:1513:150